{"id":1504,"date":"2018-02-24T21:27:20","date_gmt":"2018-02-25T01:27:20","guid":{"rendered":"https:\/\/wp.cga.ct.gov\/lib\/?p=1504"},"modified":"2025-04-29T17:11:11","modified_gmt":"2025-04-29T21:11:11","slug":"energy-other-resources","status":"publish","type":"post","link":"https:\/\/wp.cga.ct.gov\/lib\/2018\/02\/24\/energy-other-resources\/","title":{"rendered":"Energy Other resources in the library&#8217;s collection"},"content":{"rendered":"<p class=\"lib-hanging\">Connecticut broadband report \u2013 biennial report by the Dept. of Energy and Environmental Protection<\/p>\n<p class=\"lib-hanging\"><a class=\"insideonly\" href=\"http:\/\/eosweb\/eosweb_linked_documents\/2025\/UConn_CT_electrical_markets_policy_report_preliminary_findings_2025.pdf\">Connecticut electrical markets policy report preliminary findings<\/a><span class=\"outsideonly\">Connecticut electrical markets policy report<\/span> \u2013 by the UConn Puerto Rican Studies Initiative, 2025<\/p>\n<p class=\"lib-hanging\">Connecticut public utilities annual cybersecurity report \u2013 by the Public Utilities Regulatory Authority<\/p>\n<p class=\"lib-hanging\">CT Energy Efficiency Board annual report on evaluation studies and results abstracts<\/p>\n<p class=\"lib-hanging\"><a class=\"insideonly\" href=\"http:\/\/eosweb\/eosweb_linked_documents\/2025\/NE_States_Collaborative_Interregional_Transmission_strategic_action_plan_2025.pdf\">Northeast States Collaborative on Interregional Transmission strategic action plan<\/a><span class=\"outsideonly\">Northeast States Collaborative on Interregional Transmission strategic action plan<\/span> \u2013 by the Brattle Group, 2025<\/p>\n<p class=\"lib-hanging\">Operation Fuel annual report<\/p>\n<p class=\"lib-hanging\"><a class=\"insideonly\" href=\"http:\/\/eosweb\/eosweb_linked_documents\/2021\/PURA_18-12-25.pdf\">Review of electric companies\u2019 and electric distribution companies\u2019 plans for maintenance of transmission and distribution overhead and underground lines<\/a><span class=\"outsideonly\">Review of electric companies\u2019 and electric distribution companies\u2019 plans for maintenance of transmission and distribution overhead and underground lines<\/span> \u2013 by the Public Utilities Regulatory Authority, 2021<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Connecticut broadband report \u2013 biennial report by the Dept. of Energy and Environmental Protection Connecticut electrical markets policy report preliminary findingsConnecticut electrical markets policy report \u2013 by the UConn Puerto Rican Studies Initiative, 2025 Connecticut public utilities annual cybersecurity report \u2013 by the Public Utilities Regulatory Authority CT Energy Efficiency Board annual report on evaluation [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[2],"tags":[],"class_list":["post-1504","post","type-post","status-publish","format-standard","hentry","category-library"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/wp.cga.ct.gov\/lib\/wp-json\/wp\/v2\/posts\/1504","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wp.cga.ct.gov\/lib\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wp.cga.ct.gov\/lib\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wp.cga.ct.gov\/lib\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/wp.cga.ct.gov\/lib\/wp-json\/wp\/v2\/comments?post=1504"}],"version-history":[{"count":17,"href":"https:\/\/wp.cga.ct.gov\/lib\/wp-json\/wp\/v2\/posts\/1504\/revisions"}],"predecessor-version":[{"id":8317,"href":"https:\/\/wp.cga.ct.gov\/lib\/wp-json\/wp\/v2\/posts\/1504\/revisions\/8317"}],"wp:attachment":[{"href":"https:\/\/wp.cga.ct.gov\/lib\/wp-json\/wp\/v2\/media?parent=1504"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wp.cga.ct.gov\/lib\/wp-json\/wp\/v2\/categories?post=1504"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wp.cga.ct.gov\/lib\/wp-json\/wp\/v2\/tags?post=1504"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}